Investor: Ocean Group
Location: From Khanh Vinh district, Khanh Hoa province to Da Lat city, Lam Dong province
Time: 2021, last 3 months
Project description Transporting 15 wind power poles (equivalent to 45 blades 70m long, 75 pipe segments with 4.5 – 5.5m diameters, 15 nacel poles weighing over 100 tons). The total distance is 119 km with complex terrain, many sharp turns with narrow radius and many obstacles on both sides of the road, with a slope of over 10%, an altitude of 1,500m above sea level. Despite many difficulties and obstacles, Heavy Transport Nguyen Loi still completed the task excellently, transporting absolutely safe goods to the Cau Dat wind power project, Xuan Truong commune, Da Lat city.